The 4m class New Robotic Telescope (NRT) is an optical facility designed to revolutionize the rapid follow-up and classification of variable and transient objects. The project is at the stage where key systems are progressing through their detailed design phases, which presents a major engineering challenge for all project partners to manage design progress of the high-level interfacing systems while still ensuring the delivery of top-level science requirements. The freezing of key system architecture features at the preliminary design review in 2021 has allowed significant progress to be made towards a target of Engineering First Light (EFL) in 2027. The project critical path is currently driven by the optics and the enclosure. Both of these components are novel in design: the NRT will have an 18-segment primary mirror and a large, fully-opening clamshell enclosure. Particular progress has been made regarding enclosure design, software & control, science & operations software and the focal station and associated science support instrumentation. The Critical Design Review for the M3 (fold mirror) was completed Q4 2022 which enabled manufacturing of the first NRT glassware to begin and prototyping of the complete opto-mechanical, hardware and software subsystem for its control to take place. The NRT will join the 2m Liverpool Telescope on La Palma, and as such this existing facility has been exploited to prototype the new science operations user interface and the NRT wavefront sensor.
The New Robotic Telescope will be 4-meter class telescope with a fast response time (less than 30 seconds) as its primary design target. To achieve this, enough structural stiffness and a quick settling time are key factors. Over the last year, important updates to the structure have been carried out. The biggest update consists of changing the tube from a Serrurier Truss to a Multibay Truss, a tube that is more common in bigger telescopes, which provides more stiffness at a lower weight, enabling better drive performance and low settling times. A new design of the M1 Cell has also been designed, as well as updating some key parts of the structure in response to the optical specification update, that has changed from f/7.5 to f/10.6. Here we present these updates to the structure, and a parametric PyMAPDL model that allows rapid iteration over the different design parameters. Based on this finite element model, we show the preliminary static, modal, and dynamic analyses, that outline the behaviour of the design. The static analysis shows low deformations, which will allow good optical performance once the telescope is pointed at a target. Meanwhile, the modal and dynamic analyses show promising results regarding vibration, pointing and tracking performance, which will enable the telescope to move quickly enough to respond to quickly fading transient events.
The New Robotic Telescope (NRT) will be the largest fully robotic telescope in the world (4-m class). The primary mirror (M1) will be comprised of 18 independent 960 mm hexagonal segments with an actively controlled position to maintain the shape of the optical surface. The secondary mirror (M2) will be a lightweighted circular mirror of 1270 mm of diameter. This contribution presents the conceptual design and preliminary results of the M1 segment support assembly and a first study of two lightweighted substrate candidates for the M2 mirror.
The robotic 2-metre Liverpool Telescope (LT), located at Roque de los Muchachos, La Palma, has seen great success in its <15 year lifetime. In particular the facility thrives in time domain astronomy, responding rapidly to triggers from Swift and efficiently conducting a wide variety of science with its intelligent scheduler. The New Robotic Telescope (NRT) will be a 4-metre class, rapid response, autonomous telescope joining the Liverpool Telescope on La Palma in ~2025. The NRT will slew to targets and start observations within 30 seconds of receipt of a trigger, allowing us to observe faint and rapidly fading transient sources that no other optical facility can capture. The NRT will be the world’s largest optical robotic telescope. Its novel, first-generation instrumentation suite will be designed to conduct spectroscopic, polarimetric and photometric observations driven by user requirements.
The New Robotic Telescope is designed to conduct rapid target follow-up within 30 seconds of an ‘alert’ from survey facilities. To achieve this will require a quick settling time requirement for the mount structure and the mirrors. This means the structure shall be designed to be sufficiently rigid to achieve the mirror position within the ‘settle time’ after a quick slew operation. An optimization analysis using the finite element model is developed to conceptually design the mount structure that meets the mechanical and more importantly the NRT science requirements. The main objective of this study is to determine the required locked rotor resonance frequency (LRF) that provides enough rigidity for the telescope dynamic performance while minimizing the structural mass and cost.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.