Paper
25 July 2000 Baseline of the GTC operation and maintenance plan
Ana Perez-Calpena, Juan Paris P. Gonzalez
Author Affiliations +
Abstract
In order to maximize the science return while minimizing running cost, the operational and maintenance requirements are being considered during the design of the GTC. Following this adopted integrated logistic support approach; GTC has produced the baselines of the GTC Operation and Maintenance Plans. These plans describe the science operation strategies, in particular those regarding the queue schedule mode, which will play the main role in the GTC operation scenario. Also the Operation and Maintenance Plans describe the maintenance activities and the support elements (staff, handling equipment, facilities...) that are being currently defined for the GTC future operational phase. This paper briefly summarizes the main items included in the Baselines of the GTC Operation and Maintenance Plans.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Ana Perez-Calpena and Juan Paris P. Gonzalez "Baseline of the GTC operation and maintenance plan", Proc. SPIE 4010, Observatory Operations to Optimize Scientific Return II, (25 July 2000); https://doi.org/10.1117/12.392509
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Databases

Data archive systems

Safety

Calibration

Telescopes

Reliability

Observatories

RELATED CONTENT

Data interface control at the European Southern Observatory
Proceedings of SPIE (September 16 2004)
Data processing factory for the Sloan Digital Sky Survey
Proceedings of SPIE (December 24 2002)
Data Flow System operations from the NTT to the...
Proceedings of SPIE (July 03 1998)
VLT science archive system
Proceedings of SPIE (July 03 1998)
ESO data flow system in operations closing the data...
Proceedings of SPIE (July 25 2000)

Back to Top