Paper
16 June 2000 Observation scheduling scheme for the Subaru telescope
Toshiyuki Sasaki, George Kosugi, Jun A. Kawai, Toyoaki Kusumoto, Norikazu Koura, Robert Hawkins, Laurence Kramer, Anthony P. Krueger, Glenn E. Miller
Author Affiliations +
Abstract
Optimization of observation sequences is a function necessary to get high efficiency and reliability of observations. We are now implementing scheduling software into the observation software system for Subaru telescope. The scheduling engine, SPIKE, developed at STScI is used with some modification for the Subaru telescope. An observation target list prepared by observers is converted to SPIKE Lisp codes. SPIKE output is inversely converted to Subaru commands to be executed with the observation software system. Real-time scheduling is planned to re-schedule observations by judging the weather and satisfaction conditions with the help of observation history. The scheduling software can be also used as support tools for observers to indicate an object good for the next observation.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Toshiyuki Sasaki, George Kosugi, Jun A. Kawai, Toyoaki Kusumoto, Norikazu Koura, Robert Hawkins, Laurence Kramer, Anthony P. Krueger, and Glenn E. Miller "Observation scheduling scheme for the Subaru telescope", Proc. SPIE 4009, Advanced Telescope and Instrumentation Control Software, (16 June 2000); https://doi.org/10.1117/12.388405
Lens.org Logo
CITATIONS
Cited by 7 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Calibration

Control systems

Stars

Reliability

Astronomical telescopes

Astronomy

RELATED CONTENT

Ground-based testing and demonstrations of starshades
Proceedings of SPIE (July 29 2016)
Subaru quality control trinity progress report
Proceedings of SPIE (January 02 2002)
Data quality control for Subaru Telescope
Proceedings of SPIE (July 25 2000)
Observation scheduling tools for Subaru Telescope
Proceedings of SPIE (September 16 2004)
Operational performance of the Keck 10-m telescope
Proceedings of SPIE (March 21 1997)

Back to Top