Paper
6 May 2022 Monitoring data processing and analysis of very high arch dams
Janming Wu, Yu Hu, Yaosheng Tan, Chunfeng Liu, Lei Pei, Yajun Wang, Binghui Zhou
Author Affiliations +
Proceedings Volume 12256, International Conference on Electronic Information Engineering, Big Data, and Computer Technology (EIBDCT 2022); 122561D (2022) https://doi.org/10.1117/12.2636697
Event: 2022 International Conference on Electronic Information Engineering, Big Data and Computer Technology, 2022, Sanya, China
Abstract
In recent years, with the introduction of "intelligent construction", a higher vision of the quality of large projects has emerged. In the "intelligent construction" system, the core elements of construction are "comprehensive sensing, intelligent decision making and automatic control", which relies on a large number of monitoring instruments embedded in the concrete as sensing tools, and through the embedded system to analyse the sensing data and make decisions. In this paper, we start with the analysis of the monitoring data inside the extra-high arch dam, extract and integrate the data through Python, and then use the visual analysis tool QH3D to make the monitoring data inside the extra-high arch dam better serve the project and promote the quality of the project.
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Janming Wu, Yu Hu, Yaosheng Tan, Chunfeng Liu, Lei Pei, Yajun Wang, and Binghui Zhou "Monitoring data processing and analysis of very high arch dams", Proc. SPIE 12256, International Conference on Electronic Information Engineering, Big Data, and Computer Technology (EIBDCT 2022), 122561D (6 May 2022); https://doi.org/10.1117/12.2636697
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Sensors

Data analysis

Safety

Data processing

Analytical research

Software development

Temperature sensors

Back to Top