29 November 2021 Study on construction technology of bored pile foundation in karst cave and soil cave
Tianfang Mo, Guangjun Li, Weixiong Zhang, Deyuan Deng, Zhou Chen, Yingtao Wang, Hao Xu, Hui Zong
Author Affiliations +
Proceedings Volume 12080, 4th International Symposium on Power Electronics and Control Engineering (ISPECE 2021); 1208042 (2021) https://doi.org/10.1117/12.2620515
Event: 4th International Symposium on Power Electronics and Control Engineering (ISPECE 2021), 2021, Nanchang, China
Abstract
Due to the influence of karst cave, soil cave, groundwater and other factors, the construction of bored pile is extremely difficult.Combined with practical engineering, this paper, according to the theory of engineering construction difficulties, using advanced drilling, hole grouting in soluble soil and pile mode control research, adopting the construction technology of better solved the soluble soil hole site with the problem of bored piles, the construction technology of successful application in practical engineering, can provide reference for similar engineering construction.
© (2021) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Tianfang Mo, Guangjun Li, Weixiong Zhang, Deyuan Deng, Zhou Chen, Yingtao Wang, Hao Xu, and Hui Zong "Study on construction technology of bored pile foundation in karst cave and soil cave", Proc. SPIE 12080, 4th International Symposium on Power Electronics and Control Engineering (ISPECE 2021), 1208042 (29 November 2021); https://doi.org/10.1117/12.2620515
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Inspection

Cements

Soil science

Roads

Glasses

Lithium

Molybdenum

Back to Top